Title of Invention

DEVICE FOR CONTROLLING AN ARC FURNACE INSTALLATION

Abstract A device for controlling an arc furnace installation, comprising an automatic controller (3), wherein a functional unit (6) for furnace control, a functional unit (7) for electrode control and a functional unit (8) for melting control are integrated in the controller (3).
Full Text Description
Device for controlling an arc furnace installation
The invention relates to a device for controlling an arc
furnace installation, comprising an automatic controller.
Arc furnaces are often used in the steel industry, for example
for melting scrap or sponge iron, while it is also possible for
other metals to be smelted in an arc furnace. An arc furnace
is based on the conversion of electrical energy into thermal
energy, using the arc principle. Power outputs of up to 200 MW
and more are thereby generated.
An arc furnace may be designed as a DC furnace (generally with
one electrode) or as an AC furnace (generally with three
electrodes).
A steel processing plant may also comprise a number of such arc
furnaces. For example, the actual arc furnace, in which the
melting takes place, is often followed by a ladle furnace,
which is also designed as an arc furnace. The ladle is the
transporting vessel into which the liquid metal is filled from
the arc melting furnace. In the ladle furnace, quality-
enhancing additives are added, for example, or a further
treatment is carried out.
The automation of an arc furnace installation requires many
functions to be taken into consideration. The furnace control,
for activating the basic functions of the furnace, the
electrode control, by means of which the length and power of
the arc are ultimately set, and the melting control may be
mentioned here by way of example. For all of these functions,
a programmable controller is respectively provided. Whenever
an arc furnace installation is realized, these programmable
controllers must

be laboriously tested and adapted to one another each time with
respect to interfaces and satisfactory interaction. The
associated expenditure on hardware is relatively high and
higher expenditure in terms of assembly and initial operation
is incurred, since a number of programmable controllers with
their own switch cabinets have to be installed.
The invention is therefore based on the object of providing a
device for controlling an arc furnace installation which is
improved in comparison with this.
To achieve this object in the case of a device of the type
mentioned at the beginning, it is provided according to the
invention that a functional unit for furnace control, a
functional unit for electrode control and a functional unit for
melting control are integrated in the controller.
This means that, on account of the advantageous integration,
now only one controller is required for the furnace control,
the electrode control and the melting control, and this
controller performs the control centrally. There is now no
longer any need for laborious interface adaptation and complex
matching of the variously acting programming means. The
hardware costs are lowered and the expenditure in terms of
assembly and initial operation is reduced.
The electrode control is in this case designed for controlling
the form and position of the arc. This includes, for example,
the activation of the at least one hydraulically movable
electrode and the adaptation of the distance from the melting
charge.
The furnace control is used to activate general functions of
the arc furnace. These comprise, for example, a hydraulically
movable furnace cover, the tilting of the furnace, for example
when tapping slag created or when decanting the molten metal,

as well as the cooling of the oven. This similarly includes
measuring

instruments and the performance of interventional controlling
actions via an operator console, from which an operator can
influence the operation of the furnace.
The melting control is ultimately a sequence control. It
involves, for example, activating how much energy is required
at a particular point in time in order to melt the amount of
material that is to be melted at that time. Similarly, it
involves determining when, for example, an additive is to be
added.
In a further advantageous refinement, at least one further
functional unit may be integrated in the controller. Such
further functional units may be, for example, a functional unit
for energy optimization and/or a functional unit for foamed
slag detection and foamed slag control and/or a functional unit
for process optimization and/or a functional unit for
controlling the energy supply with regard to specifications of
an energy supplier and/or a functional unit for carrying out
control individually for a customer. Ideally, all these
components are integrated in a single automatic controller, so
that only this one controller is required. It is then possible
to dispense with all other controllers.
A functional unit for energy optimization may, in particular,
control the energy optimization via a neural network. Such
artificial intelligence allows the energies used to be
optimized with respect to consumption, quality and other
production parameters.
Foamed slag refers to a layer of slag which floats on the
molten metal and is deliberately built up in order that heat
does not reach the furnace wall but is absorbed in the foam.
To build up further foamed slag, carbon may be added for
example. At the same time, the level of the foamed slag is

determined, for example, by means of structure-borne sound
detectors on the furnace casing. These components

elicit a response from the functional unit for foamed slag
detection and foamed slag control.
The functional unit for process optimization may, for example,
comprise a model computer, which makes optimization of the
process also possible in the greater sense. For example, the
liquid material may be passed on directly to a continuous
casting installation, which stipulates requirements with
respect to the amount of processable material.
Controlling the energy supply with regard to specification of
an energy supplier may be necessary if, for example, maximum
amounts accepted within certain times are envisaged. The
corresponding functional unit is used to control, for example,
where energy can be saved, which unit can be switched off at
the particular time and the like.
Furthermore, a functional unit for carrying out control
individually for a customer may be integrated in the
controller. Such a functional unit comprises parameters
individually envisaged for a customer, which individualize the
overall system. However, it is also conceivable that the other
functional units are constructed in such a way that they can be
adapted to the needs of the customer without any problem, so
that individualization can already take place at the other
integrated functional units.
The device may expediently comprise an assembly unit, in which
the functional units are arranged, in particular in module
locations. Such an assembly unit may for example be a switch
cabinet in which the controller, which usually comprises a
computing device, is accommodated.
In a further advantageous configuration, the functional units
of a modular design may be designed such that they can be

exchanged or removed. This describes a modular structure which
can be adapted as desired. Accordingly, individual

functional units can be added or removed in order to adapt the
range of functions of the device to individual wishes.
Exchanging defective functional units is also a simple matter.
Moreover, it is possible without any problem, for example, to
replace obsolete functional units with newly developed
functional units, so that the device for controlling the arc
furnace installation is always up to the latest state.
With such functional units of a modular design there are
ultimately two conceivable possibilities as to how and whether
a configuration should take place. Firstly, it may be provided
that the controller is designed for automatically detecting and
configuring a functional unit. A newly introduced functional
unit accordingly communicates with the controller, whereby an
automatic configuration takes place. In this case, the
functional unit is also assigned suitable ranges of
performance, for example processors, memory space and the like.
Alternatively, however, it is also possible that module
locations are provided for functional units, each module
location being assigned a fixed range of performance of a
computing device contained in the controller. In this case, no
special configuration is necessary any longer, since each
module location, and consequently a functional unit fitted in
it, is in any case already assigned ranges of performance,
which means, for example, processor performance, memory space,
programming means and the like. Such a system is less
complicated, but less flexible.
Advantageously, the functional units may be individually
configurable. Perfect adaptation to customer wishes is then
possible.
For communication with the controller, or the computing device
contained in it, the functional units may be connected to a bus
system. All types of

known bus systems that produce the necessary performance
criteria are suitable for this.
In an advantageous refinement, it may also be provided that at
least two functional units are integrated into one functional
unit. For example, a single functional unit may be provided
for the electrode control and the energy optimization. This is
always possible whenever the performance criteria of a
functional unit make it possible to include a number of such
functionalities. This has the effect of saving module
locations and of achieving a still more compact construction.
Further advantages and details of the present invention are
evident from the exemplary embodiment presented below and by
reference to the drawing.
In it, the single figure shows a device 1 according to the
invention for controlling an arc furnace installation.
It comprises an assembly unit in the form of a switch cabinet
2, in which an automatic controller 3 is arranged. The
automatic controller 3 comprises a computing device 4, which
may include one or more processors and one or more memory
devices. Furthermore, a plurality of module locations 5 are
provided, some of which are occupied by modular functional
units 6-13. The functional units 6-13 are designed such
that they are removable, in particular exchangeable. They are
connected via the module locations 5 to a bus system 14, which
couples them to the computing device 4. The functional units 6
- 13 are individually configurable, so that they can be adapted
to specific customer wishes.
In this exemplary embodiment, each module location 5 is
assigned a specific range of performance, so that no further
configuration is required after a functional unit has been
fitted. Alternatively, it is of course also possible

that the controller 3 may be designed for automatically
detecting and configuring the functional units.
In particular, a functional unit 6 for furnace control, a
functional unit 7 for electrode control, a functional unit 8
for melting control, a functional unit 9 for energy
optimization, a functional unit 10 for foamed slag detection
and foamed slag control, a functional unit 11 for process
optimization, a functional unit 12 for controlling the energy
supply with regard to specification of an energy supplier and a
functional unit 13 for carrying out control individually for a
customer may be provided. Apart from the necessary functional
units 6-8 for furnace control, electrode control and melting
control, the other functional units 9-13 are optional, which
means that they do not have to be present to obtain an
operational device for controlling an arc furnace installation,
or may optionally take the form of a further automatic
controller. On account of the modular character, further
functional units can be retrofitted without any problem, just
as further functional units 9-13 can be removed. The
necessarily integrated functional units 6-8 can be exchanged
without any problem - for example in the event of a defect or
replacement by a more recent model.
In particular, it is also conceivable that two functional units
are integrated into one functional unit. For example, it would
be conceivable to combine the functional unit 7 for electrode
control and the functional unit 9 for energy optimization into
a single functional unit. The functional units 7 and 9 could
then be removed and replaced by the new functional unit. As a
result, fewer functional units are required.
Altogether, the device for controlling an arc furnace
installation provides an integrated solution, which is designed
to be simple in construction and maintenance, for controlling

an arc furnace installation. By being installed in only one
switch

cabinet, expenditure in terms of production, assembly and
initial operation is reduced.
In particular, it is possible in a metal processing plant to
provide not only the actual arc furnace for melting but also,
for example, a ladle furnace as a further arc furnace. Such a
further arc furnace installation can be activated with the same
device 1, in which case correspondingly modified
parameterization can be used.

Patent claims
1. A device for controlling an arc furnace installation,
comprising an automatic controller (3) , characterized in
that a functional unit (6) for furnace control, a
functional unit (7) for electrode control and a functional
unit (8) for melting control are integrated in the
controller (3).
2. The device as claimed in claim 1, characterized in. that at
least one further functional unit (9, 10, 11, 12, 13), in
particular a functional unit (9) for energy optimization
and/or a functional unit (10) for foamed slag detection and
foamed slag control and/or a functional unit (11) for
process optimization and/or a functional unit (12) for
controlling the energy supply with regard to specifications
of an energy supplier and/or a functional unit (13) for
carrying out control individually for a customer, is
integrated in the controller (3).
3. The device as claimed in claim 1 or 2, characterized in
that it comprises an assembly unit (2) , in which the
functional units (6, 7, 8, 9, 10, 11, 12, 13) are arranged
in particular in module locations (5).
4. The device as claimed in claim 3, characterized in that the
modular functional units (6, 7, 8, 9, 10, 11, 12, 13) are
designed such that they are exchangeable or removable.
5. The device as claimed in claim 4, characterized in that the
controller (3) is designed for automatically detecting and
configuring a functional unit (6, 7, 8, 9, 10, 11, 12, 13).

6. The device as claimed in claim 4, characterized in that
module locations (5) are provided for functional units (6,
7, 8, 9, 10, 11, 12, 13), each model location (5) being
assigned a fixed range of performance of a computing device
(4) contained in the controller (3).
7. The device as claimed in one of the preceding claims,
characterized in that the functional units (6, 7, 8, 9, 10,
11, 12, 13) are individually configurable.
8. The device as claimed in one of the preceding claims,
characterized in that the functional units (6, 7, 8, 9, 10,
11, 12, 13) are connected to a bus system (14).
9. The device as claimed in one of the preceding claims,
characterized in that the at least two functional units (6,
7, 8, 9, 10, 11, 12, 13) are integrated into one functional
unit (6, 7, 8, 9, 10, 11, 12, 13).

A device for controlling an arc furnace installation,
comprising an automatic controller (3), wherein a functional
unit (6) for furnace control, a functional unit (7) for
electrode control and a functional unit (8) for melting control
are integrated in the controller (3).

Documents:

938-KOLNP-2009-(04-06-2014)-ABSTRACT.pdf

938-KOLNP-2009-(04-06-2014)-ANNEXURE TO FORM 3.pdf

938-KOLNP-2009-(04-06-2014)-CLAIMS.pdf

938-KOLNP-2009-(04-06-2014)-CORRESPONDENCE.pdf

938-KOLNP-2009-(04-06-2014)-DESCRIPTION (COMPLETE).pdf

938-KOLNP-2009-(04-06-2014)-DRAWINGS.pdf

938-KOLNP-2009-(04-06-2014)-FORM-1.pdf

938-KOLNP-2009-(04-06-2014)-FORM-2.pdf

938-KOLNP-2009-(04-06-2014)-OTHERS.pdf

938-KOLNP-2009-(04-06-2014)-PETITION UNDER RULE 137.pdf

938-KOLNP-2009-(13-03-2012)-CORRESPONDENCE.pdf

938-KOLNP-2009-(13-03-2012)-OTHERS.pdf

938-kolnp-2009-abstract.pdf

938-kolnp-2009-claims.pdf

938-KOLNP-2009-CORRESPONDENCE-1.1.pdf

938-kolnp-2009-correspondence.pdf

938-kolnp-2009-description (complete).pdf

938-kolnp-2009-drawings.pdf

938-kolnp-2009-form 1.pdf

938-kolnp-2009-form 18.pdf

938-kolnp-2009-form 2.pdf

938-kolnp-2009-form 3.pdf

938-kolnp-2009-form 5.pdf

938-kolnp-2009-gpa.pdf

938-kolnp-2009-international publication.pdf

938-kolnp-2009-international search report.pdf

938-KOLNP-2009-OTHERS.pdf

938-kolnp-2009-pct request form.pdf

938-kolnp-2009-specification.pdf

938-kolnp-2009-translated copy of priority document.pdf

abstract-938-kolnp-2009.jpg


Patent Number 265910
Indian Patent Application Number 938/KOLNP/2009
PG Journal Number 13/2015
Publication Date 27-Mar-2015
Grant Date 23-Mar-2015
Date of Filing 12-Mar-2009
Name of Patentee SIEMENS AKTIENGESELLSCHAFT
Applicant Address WITTELSBACHERPLATZ 2, 80333 MUNCHEN
Inventors:
# Inventor's Name Inventor's Address
1 ARNO DÖBBELER ORIONSTR. 4 91074 HERZOGENAURACH
2 MARTIN BIERMANN SUDETENSTR. 2 91096 MÖHRENDORF
3 THOMAS MATSCHULLAT PETER-HENLEIN-STR. 15 90542 ECKENTAL
4 JOHANNES SCHARF TIERGERTENSTR. 37 96129 STRULLENDORF
5 GERD SCHELBERT BERGSTR. 18 91334 HEMHOFEN
6 UWE STÜRMER LUDWIG-THOMA-STR. 17 91083 BAIERSDORF
PCT International Classification Number G05B 19/05,G05B 7/20
PCT International Application Number PCT/EP2007/059009
PCT International Filing date 2007-08-29
PCT Conventions:
# PCT Application Number Date of Convention Priority Country
1 102006044837.5 2006-09-22 Germany