Title of Invention

AN OFFSHORE OFFLOADING SYSTEM AND METHOD FOR OFFLOADING LIQUID LNG FROM TANKER

Abstract A system for offloading LNG (liquified natural gas) from a tanker (26) in shallow waters, for regasing, or heating the offloaded LNG to produce gaseous hydrocarbons, or gas, for pressurizing the gas, and for flowing the gas to an onshore station (56), includes a structure that is fixed to the sea floor and projects above the sea surface and aids in mooring the tanker. In one system, the structure that is fixed to the sea floor is a largely cylindrical tower (12) with a mooring yoke (20) rotatably mounted on its upper end. A floating structure (14) such as a barge that weathervanes, has a bow end pivotally connected to a distal end of the yoke, so the barge is held close to the tower but can drift around the tower with changing winds, waves and currents. The tanker is moored to the tower so the barge and tanker form a combination that weathervanes as a combination. Regas and pressurizing equipment (32, 34) for heating an pressuring the LNG, and any crew quarters (36), are all located on the barge, so a low cost tower can be used. In another system, the structure is a breakwater (180).
Full Text WO 2005/045302 PCT/US2004/035503
-1-
LNG TANKER OFFLOADING IN SHALLOW WATERS
BACKGROUND OF THE INVENTION
Hydrocarbons that are gaseous at room temperature such as 20°C, are often transported by tanker as LNG (liquified natural gas) at -160°C and atmospheric pressure. Other cold forms during transport are hydrates (gas entrapped in ice) and cooled CNG (compressed natural gas that has been cooled well below 0°C to reduce the pressure required to keep it liquid). At the tanker's destination, the LNG (or other cold gas) may be offloaded, heated and pressurized, and carried by pipeline to an onshore station for distribution (or possibly for use as by a power plant at the onshore station).
Proposed prior art offloading and regas/injection systems (for heating and pressuring LNG) include a fixed platform extending up from the sea floor to a height above the sea surface and containing facilities that heat and pump the cold hydrocarbons and containing crew facilities (beds, toilet, food storage, etc.). The heating is sufficient to transform LNG into gas that is warm enough (usually at least 0°C) to avoid ice formations around noncryogenic hoses and pipes that carry the gas. The platform also carries a pump system that pumps the gas to a high enough pressure to pump it along a sea floor pipeline to an onshore station, and/or to a cavern and maintain a high pressure in the cavern so gas can flow therefrom to an onshore station. A platform that is large enough to carry such gas heating and pumping systems can be expensive even in shallow waters.
It is possible to greatly lower costs by the use of a floating weathervaning structure such as a barge with a turret near the bow, that is moored by catenary chains to the sea floor, to carry the regas and pressurizing equipment and crew quarters, and to moor the tanker. However, in shallow depths (e.g. less than about 70 meters), drifting of the vessel tends to lift the entire length of chain off the sea floor. This can result in a sudden increase in chain tension rather that a gradual increase that is required. A system of minimum cost, for mooring a taiakep offloading LNG from the tanker, heating and pressuring the LNG, accommodating any crew, and flowing the gaseous hydrocarbons to an onshore station, in a sea

WO 2005/045302 PCT/US2004/035503
-2-
location of shallow depth, would be of value.
SUMMARY OF THE INVENTION
In accordance with one embodiment of the invention, applicant provides a system for use in shallow depths such as no more than 70 meters, for mooring a tanker carrying cold hydrocarbons (well below 0°C, and usually LNG), regasingthe hydrocarbons (heating cold hydrocarbons, usually to above 0°C, as to gasify LNG), pressurizing the now-gaseous hydrocarbons, holding a crew that operates and maintains the equipment, and carrying the gaseous hydrocarbons to an onshore installation, all in a system of minimum cost. In one system, applicant provides a floating structure such as a barge, and a simple tower whose only major function is to permanently moor the barge while allowing it to weathervane. The tanker is attached to the barge so they weathervane together. The barge may be attached to the tower by a yoke that can pivot about a vertical axis on the tower to allow the barge to weathervane, and the tower carries a fluid swivel to pass fluids while the barge weathervanes. A regas unit, a pressurizing unit and crew quarters, are all located on the barge, and not on the tower.
In another system, a fixed structure in the form of a breakwater, provides a shallow sea location at which the tanker can be moored , while the tanker is protected from prevailing winds and waves. Regas and pressurizing units as well as crew quarters lie on the breakwater. The breakwater has a length at least 60%, and preferably at least 100%, of the tanker length, has a width no more that one-fourth as much as its length and extends a plurality of meters above the sea surface.
The regas and pressurizing units can be electrically energized, and electric power is carried between an onshore electric power station and the structure on which the regas and pressurizing units lie.
The novel features of the invention are set forth with particularity in the appended claims. The invention will be best understood from the following description when read in conjunction with the accompanying drawings.

WO 2005/045302 PCT/US2004/035503
-3-
BR1EF DESCRIPTION OF THE DRAWINGS
Fig. 1 is a side elevation view of a shallow water system for mooring a tanker carrying LNG, processing the LNG and delivering it to an onshore station.
Fig. 2 is a side elevation view of a portion of the system of Fig. 1.
Fig. 3 is a left side and rear isometric view of a modified system of the type shown in Fig. 1, with the yoke connected to the floating structure
Fig. 4 is a left side and front isometric view of the system of Fig. 3, with the yoke approaching the floating structure but not yet connected to it.
Fig. 5 is a side elevation view of a system similar to that of Fig. 1, but with an electric power transfer portion.
Fig. 6 is a plan view of a system similar to that of Fig. 5, but with the floating structure and tanker connected in tandem to weathervane together.
Fig. 7 is an isometric view of a system of another embodiment of the invention, where the floating structure is of the direct attachment type that fixes itself to the tanker and with the tanker moored though a small yoke and hawser to the tower.
Fig. 8 is an isometric view of a portion of the system of Fig. 7, showing the top of the tower and the yoke thereof.
Fig. 9 is an isometric view of a system of another embodiment of the invention where a breakwater structure fixed to the sea floor at a shallow location, is long and narrow and to which the tanker is directly moored.
Fig. 10 is a plan view of the system of a portion of the system of Fig. 9.
Fig. 11 is a side elevation view of a portion of the system of Fig. 9.
DESCRIPTION OF THE PREFERRED EMBODIMENTS
Fig. 1 illustrates an offloading/injection system 10 for shallow water, in which a moderate cost fixed tower 12 is used in conjunction with a floating and weathervaning structure in the form of a barge 14. A yoke 20 which can rotate around the tower axis 22, allows the floating and weathervaning barge to drift a limited distance away from the tower and urges the barge back towards the tower, as with counterweights 24. Thus, the barge can weathervane, to head in different

WO 2005/045302 PCT/US2004/035503
-4-
directions with changes in winds, waves and currents and can move slightly away and back towards the tower to minimize the forces resulting from large waves. A tanker 26 is moored directly to the barge and weathervanes with it.
The tanker carries cold hydrocarbons that are cooled well below D °C, and which must be heated to at least 0°C before they can be pressurized and flowed though a pipeline to shore. The most common type of such cold hydrocarbons is LNG (liquified natural gas) which has been cooled to -160°C so it is liquid at atmospheric pressure. Another type is hydrates wherein gas is trapped in ice, and still another type is CNG (compressed natural gas) that is both cooled and pressurized. Before such cooled hydrocarbons can be passed though ordinary (noncryogenic) pipes, they must be heated to at least 0°C to prevent ice formations about the pipes.
Fig. 1 shows processing equipment 30 that includes a regas unit 32 which heats LNG to turn it into a gas and to heat the gas to at least 0°C, and an injection(pressurizing) unit 34, that is mounted on the barge 14. Crew quarters 36 are usually provided, and are also mounted on the barge. A gas-carrying hose 40 extends from the barge to a fluid swivel 42 on the tower. A nonrotatable part of the fluid swivel is fixed to the main part 44 of the tower. The main part of the tower is largely cylindrical, in that it has perpendicular horizontal dimensions that are about the same in that neither one is more than about twice the other, to avoid interference with the weathervaning barge and avoid having to use an extra long yoke. A pipe 50 extends down from the fluid swivel to a seafloor platform 52. The platform connects to a cavern 54 and through a seafloor pipeline 58 to an onshore facility 56. A cavern can lie in the ground under the sea, or in ground not covered by the sea. The cavern has a capacity to store at least 0.5 billion standard cubic feet of gas.
By mounting the regas and injection units 32,34 and crew quarters 36 on the barge 14 rather than on the mooring tower 12, applicant greatly reduces the cost of the tower while only moderately increasing the cost of the barge. The fact that the regas unit lies on the barge, which is moored to the tanker, allows LNG on the tanker to be offloaded in less time and with less expensive equipment (especially

WO 2005/045302 PCT/US2004/035503
-5-
cryogenlc hoses), than if the LNG had to pass from the tanker to the barge and then to a regas unit on the tower before being regassed. The fact that the yoke absorbs sudden large mooring forces as when a large wave impacts the barge and tanker, by allowing the barge and tanker to move away from the tower and to then pull them back, avoids the use of a massive and expensive tower. The tower is devoid of machinery (other than the fluid swivel) and operates without an onboard crew or crew quarters.
Fig. 2 shows that the yoke has a top bearing part 60 that can rotate about the vertical axis 22, Proximal and distal ends 63, 65 of the yoke are connected respectively to the tower upper end 67 and to the barge 14. The yoke includes a linkage 61 comprising a pair of largely vertical proximal beams 62 on opposite sides of the yoke, with upper ends pivotally connected about a horizontal axis 64 to the top bearing part and with lower ends carrying the counterweights 24. The linkage also includes a pair of distal beams 70 pivotally connected about a horizontal axis 72 to the lower ends of the proximal beams and having distal ends pivotally connected about a horizontal axis 74 to the barge.
Figs 3 and 4 show another system 80, and shows some details of a yoke 20A, the top of the tower 12A, and the floating structure 14A. Fig. 4 shows that the yoke includes a yoke base 82 that is mounted on a bearing assembly 84 that allows the base to rotate about a vertical axis 86. A beam structure linkage 90 with a counterweight 92, carries a pair of arms 94, 96 that pivot about axes 100,102. A structural connection head 104 with a uni-joint lies at the end of the arm 96 connects to a coupling 106 on the floating structure 14A. Hoses 108,109 connect to transfer gaseous hydrocarbons. Fig. 3 shows a short cryogenic hose or pipe arrangement 110 that carries LNG from the tanker 26 to the barge, and mooring lines 112 that connect the tanker to the barge. Applicant notes that cryogenic conduits that can carry LNG are expensive, and minimizing the amount of such conduits on the barge minimizes the cost of the system.
The mooring towers 12 and 12A of Figs. 1-4 are useful in shallow waters in a moderately calm sea having a depth D (Fig. 1) of up to about 50 meters, and are useful in more turbulent waters having a depth of up to about 70 meters. As

WO 2005/045302 PCT/US2004/035503
-6-
mentioned above, a floating structure moored by catenary chains to the sea floor is effective in deeper waters, where its catenary chains are more effective while applicant's systems are especially effective in shallow waters. If a storm is approaching the systems of Figs. 1-4, which could produce waves that exceed the system mooring capacity, any tanker is unmoored from the barge. The barge can be disconnected from the yoke and towed away in hurricane situations.
Fig. 5 illustrates a system 120 that is similar to that of Fig. 1, but with an electrical power cable, or power line 122 that carries electrical power between an onshore power and gas facility 124 and the barge floating structure 14. The regas and pressurizing units 32,34 are electrically powered. In Fig. 5, electric current and power can flow only from the onshore facility, which includes an onshore power line 126, and the barge 14. However, it is possible to build a power plant 130 on the floating structure 14, which uses hydrocarbons as fuel to produce all electricity required on the floating structure.
A tanker is moored to the barge and LNG on the tanker is unloaded, perhaps once in every five days. It may take one day to offload the tanker, during which time some of the LNG is stored in LNG tanks on the barge, while some of the LNG is regassed, pressurized and flowed to the onshore station and/or cavern 54. It may take an additional day to regas and pressurize the LNG stored in the tanks on the barge. During the other three days before the tanker arrives again, the power plant on the barge can continue to be operated to produce electricity, and that electricity is delivered to the shore-based facility 124. Such power, delivered for perhaps three days out of every five, supplements electrical power produced by onshore power plants. In Fig. 5, the swivel 131 at the top of the tower 12A receives current over line 132 and carries current to a power line 133 extending along the height of the tower and a power line 122 that extends along the sea floor to the onshore facility 124.
Fig. 6 shows that the tanker 26 can be moored to the barge 14 to weathervane with it, by a hawser 140 that extends from the stern of the barge to the bow of the tanker.
Fig. 7 shows a floating structure in the form of a direct attachment structure

WO 2005/045302 PCT/US2004/035503
-7-
150 that has a buoyancy-adjusting part 152 and a propulsion part 154. The direct attachment floating structure can lie low in the water and slowly propel itself until its under-tanker part 156 lies under the tanker. The direct attachment structure then deballasts itself (by emptying water from ballast tanks) until its parts 156,160 engage the tanker. A mooring hawser 162 that previously held the floating structure in the vicinity of a tower 164, is detached from the floating structure and attached to the tanker. The direct attachment floating structure 150 includes a regas system that warms LNG and a pump system that pumps the gas though a gas hose 166 to a swivel 170 on the tower. From the swivel, the gas flows down the tower to the sea floor as in the other embodiments of the invention. Fig. 8 shows the top of the tower 164 with a yoke 172 that has a proximal end 174 that can rotate about the tower axis 176 and that connects to the floating structure or tanker though the hawser 162.
Figs. 9-11 illustrate another gas offloading system 178 for a shallow sea location of no more than 70 meters depth, in which a breakwater 180 is fixed to the sea floor 181 and a tanker 26 is moored alongside the breakwater. The breakwater is oriented so one side 182 lies opposite the direction 184 of prevailing winds and waves. The breakwater 180 has a length that is at least 60%, and preferable at least 100% but no more than 200% of the length of the tanker that will be moored alongside the breakwater. The breakwater projects a plurality of meters above the mean tide sea surface 186 along a majority of the breakwater length. This allows the breakwater to shield the tanker from most of the forces of winds and waves, so the tanker can be safely moored in a fixed position alongside the breakwater, that is, with the tanker extending parallel to the length of the breakwater. The figures show mooring lines 190 and bumpers 192. The breakwater preferably has an average width W that is less than 25% of its length L and actually has a width less than one-eighth its length. LNG tankers are commonly about 200 meters long and the breakwater has a length on the order of magnitude of 200 meters.
A cryogenic hose or pipe 200 transfers very cold (e.g.-160°C) hydrocarbons from the tanker to equipment 202 placed on the top of, or on the inside of the breakwater. The equipment includes a regas unit that heats the cold gaseous

WO 2005/045302 PCT/US2004/035503
-8-
(when heated) hydrocarbons, and pumps that pressurize the gas. The pressurized gas is pumped though a pipe 204 that carries it to a reservoir pipe 206 that leads to a cavern 210 (that lies under the sea or under an onshore location), and /or to a sea floor pipe 212 that carries gas past a shoreline 214 to an onshore installation 216.
Fig. 9 shows an electrical power line 220 that extends between an onshore power system 222 and the breakwater. The power line can be used to carry electrical power to the breakwater to power electrically energized regas and pumping equipment, or can be used to carry power from a power generating unit 224 on the breakwater to the onshore system when most electric power is not required at the breakwater.
Thus, the invention provides gas offloading and pressurizing systems for transferring LNG or other cold hydrocarbons whose temperature is well below OºC, from a tanker to an onshore facility and/or a cavern, at an offshore location of shallow depth (no more than 70 meters). A system can includes a fixed tower with a mooring swivel at the top, and a floating structure such as a barge that is moored to the tower to weathervane about the tower. The floating structure is connected to the tanker so the combination of floating structure and tanker weathervanes as a combination. Regas facilities for heating cold hydrocarbons (below 0°C) and pressurizing facilities for pumping the resulting gas, as well as any crew quarters, are located on the floating structure where they can be placed at minimum cost. This allows the use of a tower of minimum size and cost. The floating structure can be a barge that is permanently moored to a tower yoke, or a direct attachment floating structure that fixes itself to the tanker while the tanker is moored to the tower. An electric power cable can extend between the floating structure and an onshore power system. Electrical energy can be carried frpm the shore to the floating structure to power electrically energized equipment, or electrical energy can be carried from an electricity generator on the floating structure to an onshore electric distributing facility when such electricity is not needed on the floating structure.
Another gas offloading and pressurizing system for shallow depths, includes

WO 2005/045302 PCT/US2004/035503
-9-
a breakwater to which a tanker is moored, which shields the tanker from winds and waves and which also carries regas and pressurizing equipment.
Although particular embodiments of the invention have been described and illustrated herein, it is recognized that modifications and variations may readily occur to those skilled in the art, and consequently, it is intended that the claims be interpreted to cover such modifications and equivalents.

WO 2005/045302 PCT/US2004/035503
-10-
WHAT IS CLAIMED IS:
1. An offshore offloading system (10,80) for offloading liquid LNG from
a tanker (26) that lies in a shallow sea, and passing the LNG through a regas unit
(32) to create warmed gaseous hydrocarbons and passing the warmed
hydrocarbons through a gas conduit arrangement (40, 42, 50, 108, 109) to an
onshore station (56,124) comprising:
a floating structure (14,14A, 150) that is coupled to said tanker to receive said liquid LNG therefrom;
a mooring tower (12,12A) lying in said sea, said tower having a lower end mounted at a fixed position on the sea floor and having an upper end extending above the sea surface;
a yoke (20, 20A, 172) having a proximal end (63) that is rotatable about a primarily vertical axis (22) on the tower upper end, and having a distal end (65) coupled to said floating structure;
said regas unit lies on said floating structure, and said tower is devoid of regas equipment.
2. The system described in claim 1, including:
a gas storage cavern (54);
said gas conduit arrangement includes a fluid swivel (42) mounted on said tower, a first conduit part (40,108,109) that extends from said floating structure to a rotatable part of said fluid swivel, a second conduit part (50) that extends from said fluid swivel down to said cavern, and a third conduit part (58) that extends from said cavern to said onshore station, whereby to store varying amounts of gaseous hydrocarbons in the cavern and flow them more evenly to the onshore station.
3. The system described in claim 1 wherein:
said floating structure is a direct attachment structure (150) that is fixed to said tanker; and including
a flexible hawser (162) that has one end fixed to said yoke distal end and an opposite end fixed to said tanker, said hawser being coupled to said floating

WO 2005/045302 PCT/US2004/035503
-11-
structure through said tanker.
4. The system described in claim 3 wherein:
said tower has an upper end with a fluid swivel (170);
said gas conduit arrangement includes a hose (166) that lies in the sea and that has one end connected to said direct attachment structure and an opposite end connected to said fluid swivel.
5. The system described in claim 1 wherein:
said yoke includes a linkage (61) having a plurality of rigid beams pivotally connected in series, including a distal rigid beam (70) that is pivotally connected to said floating structure;
said floating structure is a weathervaning vessel, with a bow end that points toward waves, winds and currents;
said tanker is a weathervaning vessel, and said floating structure and tanker are connected to form a combination that weathervanes so said tanker and floating structure weathervane together.
6. The system described in claim 1 including:
an energized injection unit (34) that consumes power and that pressurizes said warmed gas sufficiently that the warmed gas flows through said conduit arrangement to said onshore station without pressure boosting along the way;
said injection unit lies on said floating structure, and said tower is devoid of an energized injection unit that boosts the pressure of the warmed gas,
7. The system described in claim 1 wherein:
said regas unit is electrically powered; and including
an onshore electrical power system (124), and an electric power line arrangement (122,131,132) extending between said onshore power system and said floating structure.

WO 2005/045302 PCT/US2004/035503
-12-
8. A method for transferring hydrocarbons that have been cooled for transport in a non-gaseous form, from a tanker (26) that lies in a shallow region of a sea, to an onshore station (56,124), comprising:
mooring a floating structure (14, 14A, 150) to a tower (12, 12A) having a lower end fixed to the sea floor in said shallow region, so the floating structure can move about a vertical axis extending through the tower, connecting the tanker to the floating structure, and weathervaning the combination of said floating structure and tanker about said tower;
transferring said hydrocarbons from the tanker to the floating structure, passing the hydrocarbons through a fluid swivel (42,131) at the top of said tower, and passing the hydrocarbons down along said tower to the sea floor and from there to said onshore station, including heating the hydrocarbons to create warmed hydrocarbon gas and pressurizing the warmed gas;
said steps of heating the hydrocarbons and pressurizing the warmed gas occurring before the hydrocarbons reach said fluid swivel on the top of said tower.
9. The method described in claim 8 wherein:
said step of passing the hydrocarbons down along said tower to the sea floor and from there to said onshore station, includes passing hydrocarbons that have passed along the tower to the sea floor, to an underground cavern (54) for storage therein, and then to said onshore station for distribution.
10. The method described in claim 8 wherein:
said step of mooring a floating structure to a tower includes establishing a yoke (20,20A, 172) with a proximal end connected to the tower to move about said vertical axis and with a distal end of the yoke connected to the floating structure, with the yoke including a linkage (61) having a plurality of pivotally connected rigid links.
11. An offshore system (178) for offloading liquid LNG from a long tanker
(26) that lies in a shallow sea, and passing the LNG through equipment (22) that

WO 2005/045302 PCT/US2004/035503
-13-
creates warmed gaseous hydrocarbons and passing the warmed hydrocarbons through a gas conduit (204, 212, 206, 210) arrangement to an onshore station (216) comprising:
an artificial breakwater device (180) comprising a structure with a lower end fixed to the sea floor and an upper end extending a plurality of meters above the sea surface (186), said breakwater device having a breakwater length (L) that is at least 60% of the length of said tanker, and having an average width (W) that is no more than 25% of said breakwater length, said breakwater device having opposite breakwater sides (182) spaced by said width;
said tanker lying alongside a first of said sides (182) of said breakwater, and moored to said breakwater;
regas and pressurizing equipment (202) on said breakwater that heats liquid LNG to turn it into gas and that pressurizes the gas;
an offloading conduit (200) that offloads said liquid LNG from said tanker to said breakwater and carries it to said regas and pressurizing equipment.
a second conduit (204, 212) that carries gas from said regas and pressurizing equipment to said onshore station.
12. The system described in claim 11 wherein:
said breakwater device has a length that is at least 8 times said average width.
13. The system described in claim 11 wherein:
said breakwater first side lies opposite the direction (184) of prevailing winds and waves.
14. The system described in claim 11 wherein:
said regas and pressurizing equipment is electrically energized; and including
an onshore electrical power system (222), and an electric power line (220) extending on the sea floor and between said onshore power system and said

WO 2005/045302 PCT/US2004/035503
-14-
equipment on said breakwater device.
15. The system described in claim 11 including:
a cavern (210);
said second conduit includes a first conduit portion (204,206) that extends from said regas and pressurizing equipment to said cavern, and a second conduit portion (212) that extends from said cavern to said onshore station, whereby to provide a more constant flow of gas to said onshore station.
16. A method for transferring cooled hydrocarbons that have been cooled
for transport in a non-gaseous form, from a tanker (26) that lies in a shallow region
of a sea to an onshore station (216), comprising;
mooring the tanker to an artificial breakwater that lies offshore, is fixed to the sea floor and projects above the sea surface, has a long side with a length of at least 60% of the tanker length and short sides with lengths less than 25% of said long side, including mooring the tanker along a side of the breakwater that lies opposite the direction of prevailing winds and waves;
transferring said cooled hydrocarbons to said breakwater, heating the cooled hydrocarbons in a regas unit on the breakwater to produce gas, and passing the gas to the onshore station.
17. The system described in claim 16 wherein:
said step of passing the gas to the onshore station includes passing the gas to a cavern and passing gas from the cavern to the onshore station.
A system for offloading LNG (liquified natural gas) from a tanker (26) in shallow waters, for regasing, or heating the offloaded LNG to produce gaseous hydrocarbons, or gas, for pressurizing the gas, and for flowing the gas to an onshore station (56), includes a structure that is fixed to the sea floor and projects above the sea surface and aids in mooring the tanker. In one system, the structure that is fixed to the sea floor is a largely cylindrical tower (12) with a mooring yoke (20) rotatably mounted on its upper end. A floating structure (14) such as a barge that weathervanes, has a bow end pivotally connected to a distal end of the yoke, so the barge is held close to the tower but can drift around the tower with changing winds, waves and currents. The tanker is moored to the tower so the barge and tanker form a combination that weathervanes as a combination. Regas and pressurizing equipment (32, 34) for heating an pressuring the LNG, and any crew quarters (36), are all located on the barge, so a low cost tower can be used. In another system, the structure is a breakwater (180).

Documents:

01070-kolnp-2006 abstract.pdf

01070-kolnp-2006 claims.pdf

01070-kolnp-2006 correspondence others.pdf

01070-kolnp-2006 description complete.pdf

01070-kolnp-2006 drawings.pdf

01070-kolnp-2006 form 3.pdf

01070-kolnp-2006 form 5.pdf

01070-kolnp-2006 form-1.pdf

01070-kolnp-2006 international publication.pdf

01070-kolnp-2006 pct fprm.pdf

01070-kolnp-2006-assignment.pdf

01070-kolnp-2006-correspondce other-1.1.pdf

01070-kolnp-2006-form-3-1.1.pdf

01070-kolnp-2006-priority document.pdf

1070-KOLNP-2006-(15-05-2012)-CORRESPONDENCE.pdf

1070-KOLNP-2006-(17-10-2012)-CORRESPONDENCE.pdf

1070-KOLNP-2006-(21-06-2013)-CORRESPONDENCE.pdf

1070-KOLNP-2006-(28-10-2013)-CLAIMS.pdf

1070-KOLNP-2006-ABSTRACT.pdf

1070-KOLNP-2006-CLAIMS.pdf

1070-KOLNP-2006-CORRESPONDENCE OTHERS 1.1.pdf

1070-KOLNP-2006-DESCRIPTION COMPLETE.pdf

1070-KOLNP-2006-OTHERS.pdf

1070-KOLNP-2006-PCT PRIORITY DOCUMENT NOTIFICATION.pdf

1070-KOLNP-2006-PETITION UNDER RULE 137.pdf

1070-KOLNP-2006-REPLY TO EXAMINATION REPORT.pdf

abstract-01070-kolnp-2006.jpg


Patent Number 258412
Indian Patent Application Number 1070/KOLNP/2006
PG Journal Number 02/2014
Publication Date 10-Jan-2014
Grant Date 07-Jan-2014
Date of Filing 25-Apr-2006
Name of Patentee SBM-IMODCO, INC
Applicant Address 1255, ENCLAVE PARKWAY, SUITE 400, HOUSTON, TX 77077
Inventors:
# Inventor's Name Inventor's Address
1 POLLACK, JACK 14855, MEMORIAL DRIVE HOUSTON, TX 77079
2 WILLE, HEIN 9 RUE MONTE ST. F-06360 EZE, FRANCE
PCT International Classification Number E02D 23/02
PCT International Application Number PCT/US2004/035503
PCT International Filing date 2004-10-26
PCT Conventions:
# PCT Application Number Date of Convention Priority Country
1 60/515,767 2003-10-30 U.S.A.
2 10/962,955 2004-10-12 U.S.A.
3 60/550,133 2004-03-04 U.S.A.
4 60/559,989 2004-04-05 U.S.A.