Title of Invention

"A HEAD-EXTENDED PILE FOR SUPPORTING LOAD OF A STURCTURE"

Abstract Disclosed herein are a head-extended pile for supporting load of a structure and a construction method of the same. The head-extended pile has a reinforcement part provided at the front end of the pile pile. The reinforcement part has a diameter larger than that of the pile so that the front end supporting force of the pile is increased. When the head-extended pile is applied according to the present invention, the stability of proof stress of the pile, improved construction workability and better economic efficiency are expected.
Full Text PILE WITH AN EXTENDED HEAD AND WORKING
METHOD OF THE SAME
[Technical Field]
The present invention relates to a head-extended pile, and more
particularly to a head-extended pile having an increased supporting force to
support load of a structure. Also, the present invention relates to a method for
constructing such a head-extended pile with stability, construction workability,
and economic efficiency.
[Background Art]
When a building or a structure is built, construction of a foundation for
reinforcing the ground is generally carried out according to conditions of the
ground or the load of the building or the structure so that the building or the
.
structure can be supported on the ground. Construction of a shallow foundation or
a deep foundation is carried out based on various conditions, such as load of a
structure. The shallow foundation is a foundation having a penetration width ratio
below 1 while the deep foundation is a foundation having a penetration width ratio
above 1. In the case of the shallow foundation, a structure is directly supported on
the ground without using piles. In the case that a structure is not sufficiently
supported on the ground, on the other hand, piles are used to reinforce a
supporting force of the ground.
A pile foundation system is a foundation system characterized in that
heads of the constructed piles are connected to a structure. Piles may be classified
into steel piles, concrete piles, and composite piles on the basis of their material.
Pile installation methods may be classified into pile driving, auger drilled piling,
and in-place casting.
The pile driving is a method characterized in that a pile is erected, and is
then forcibly driven into the ground by hammering until the pile is folly penetrated
into the ground. When the pile is forcibly penetrated into the ground by means of
hammering energy, the pile is penetrated while the pile pushes through the soil
around the pile. Consequently, a supporting force of the pile is excellent, and the
pile is simply constructed.
However, the pile driving method has a drawback in that it is difficult to
penetrate the pile vertically when the pile need to be deeply penetrated into the
ground. Also, excessive vibration and noise are generated when the pile driving
method is carried out. Consequently, the pile driving method is limitedly used in
urban areas due to certain restrictions.
On the other hand, the auger drilled piling is a method characterized in
that a hole is previously bored in the ground, a cement paste is poured halfway
into the hole, and then a pile is fixedly inserted into the hole. The auger drilled
piling method can solve the drawbacks of the pile driving method. Currently, the
pile burying method is mainly used to construct pile foundations in urban areas.
The construction of the foundation is an extremely important in the
aspect of building the structure. Various pile installation methods are used without
consistency on the basis of the personal experience of constructors because
conditions of the ground or vary according to site, or operation of a pile-driving
machine is not fully understood. As a result, the pile constructing work: is not
easily carried out.
FIG. 1 is a conceptual drawing showing the relation between an inherent
proof stress of a pile and a constructional proof stress of the constructed pile. As
shown in FIG. 1, load (PF) of a structure 11 is supported by means of
constructional proof stress of a plurality of piles 12 penetrated into the ground
below the structure 11. The constructional proof stress of the constructed pile 12
is the sum of a front end bearing force (TF) at the front end of the pile and a
surrounding frictional force (SF) at the outer circumference of the pile. Generally,
the inherent proof stress of the pile is larger than constructional proof stress.
However, the constructional proof stress of the pile is decreased due to its bad
construction workability.
For example, a O 400 high-strength concrete pile (hereinafter, referred to
as "PHC pile") has an inherent proof stress of 112 tf and a constructional proof
stress of 60 to 80 tf. As a result, 32 to 52tf of the inherent proof stress of the pile
is wasted. Especially when auger drilled piling method is used, a drilled hole
having a diameter larger than that of a pile, the pile is penetrated into the hole, and
cement paste is poured between the pile and the ground in order to increase a
surrounding frictional force. However, a test of the pile after the construction is
completed reveals that the surrounding frictional force is insignificant and most of
the constructional proof stress is the front end bearing force. Consequently, it is
necessary to increase the constructional proof stress near the inherent proof stress
of the pile in the auger drilled piling method so that efficiency in use of the pile
can be improved.
[Disclosure]
[Technical Problem]
Therefore, the present invention has been made to solve the above
problems, and it is an object of the present invention to provide a head-extended
pile having an increased constructional proof stress, so that the pile can have
increased support load for a structure without increasing the weight and the
volume of the pile used in a auger drilled piling method, moreover efficiency in
use of the pile and economic efficiency of the pile are improved. It is also the
object of the present invention to provide a method for constructing such a headextended
pile with stability, construction workability, and economic efficiency.
[Technical Solution]
In accordance with one aspect of the present invention, the above and
other objects can be accomplished by the provision of a pile having a
reinforcement part attached to or integrally formed with the front end of the pile,
the reinforcement part having a prescribed thickness and a diameter slightly larger
than that of the pile, so that the front end supporting force of the pile is increased.
The reinforcement part may be formed at one end of the pile or at either
end of the pile.
The pile can have a additional a conical member or reinforcement wings
formed on the reinforcement part.
In accordance with another aspect of the present invention, there is
provided a constructing method of a head-extended pile in the ground composed
of collapsible soil when the ground is bored, comprising the steps of: selecting a
pile, preparing and checking a pile driving operation, and removing obstructions
(S10); inspecting the ground, reinforcing the ground, and installing a pile-driving
machine (S20); checking perpendicularity of a casing or a screw auger and a
reader at the front and. at the side to fix the position of the casing (S30);
confirming a soil layer status where the pile can be driven on the basis of
excavation, a geological survey report, used current of an auger motor, the
discharged amount of soil, and a trial pile driving operation so that the excavation
is carried out by means of the casing and the screw auger (S40); mixing water and
cement by means of an exclusive cement mixer (S50); injecting cement paste at
high pressure after the screw auger is withdrawn (S60); penetrating the screw
auger again to stir the cement paste and treat the slime (S70); slowly withdrawing
the screw auger (S80); erecting the head-extended pile so that the head-extended
pile is penetrated by means of its own weight (S90); fixing the upper end of the
head-extended pile by means of the screw auger (SI00); slowly withdrawing the
casing after the upper end of the pile is fixed by means of the screw auger (SI 10);
and driving the head-extended pile so that the pile can be penetrated (SI20).
In accordance with yet another aspect of the present invention, there is
provided a constructing method of a head-extended pile in the ground composed
of uncollapsible soil when the ground is bored, comprising the steps of: selecting a
pile, preparing and checking a pile driving operation, and removing obstructions
(S200); inspecting the ground to be constructed, reinforcing the ground, and
installing a pile-driving machine (S210); checking perpendicularity of a screw
auger and a reader at the front and at the side to fix the position of the screw auger
(S220); checking a soil layer where the pile can be driven on the basis of
excavation, a geological survey report, used current of an auger motor, the
discharged amount of soil, and a trial pile driving operation so that the excavation
is carried out by means of the screw auger (S230); mixing water and cement by
means of an exclusive mixer to obtain cement paste (S240); withdrawing the
screw auger (S250); injecting the cement paste at high pressure (S260);
penetrating the screw auger again to stir the cement paste and treat the slime
(S270); erecting the head-extended pile so that the pile is penetrated by means of
its own weight (S280); and driving the head-extended pile so that the pile can be
penetrated (S290).
[Advantageous Effects]
According to the present invention, the constructional proof stress of a
pile can be increased to near the inherent proof stress of the pile without
increasing the weight and the volume of the pile. Consequently, the quantity of
the piles to be used in a pile burying work is reduced, therefore efficiency in use of
the pile and economic efficiency of the pile are improved. Also, the reinforcement
part or the reinforcement disk can be attached to a conventional pile in market.
Consequently, applicability of the conventional pile is also improved.
A designed proof stress of the pile is generally decided by pile
manufacturers in such a manner that the designed proof stress corresponds to the
proof stress of the pile decided on the basis of the ground conditions or the
construction workability, which is lower than the inherent proof stress of the pile.
As a result, the designed proof stress of the pile is reduced by approximately 30 to
40 % compared to inherent proof stress. However, 100 % of the proof stress can
be utilized in this construction method when the head-extended pile according to
the present invention method is used. As a result, the designed proof stress of the
pile is decided so that the designed proof stress of the pile can be matched the
inherent proof stress of the pile.
The designed proof stress of the pile can be increased with the result that
the quantity of the piles to be used is decreased, which leads to saving the cost and
time of construction. Also, the length of the pile can be decreased when the design
is completed so that the pile has a relatively small proof stress.
When the head-extended pile is prepared and driven in the same manner
as the conventional pile constructing method, and the pile construction is
completed at an N value of approximately 50/20 ~ 10, a required supporting force
is obtained as compared to a pile construction designed in the field.
Consequently, the pile constructing method according to the present
invention can guarantee the economic efficiency, safety, and improved
construction workability as compared to the conventional pile constructing
method.
When the designed proof stress of the pile is small, the length of the pile
can be reduced by approximately 20 to 40 %. Consequently, cost of construction
is reduced.
In the case that the designed proof stress of the pile is increased through
the use of the head-extended pile according to the present invention, the total
number of the piles may be reduced by approximately 30 to 40 %.
Also, the size of pile cap is decreased, arid thus the amount of concrete
cement and required reinforcing steel is reduced by approximately 10 to 20 %.
Furthermore, construction time is considerably reduced as the total number of the
piles is decreased, and direct material and labor cost, indirect cost, personnel
expenses, and financial expenses according to duration, are considerably reduced.
The present invention is very useful method for building and civil construction.
[Description of the Drawings]
The above and other objects, features and other advantages of the present
invention will be more clearly understood from the following detailed description
taken in conjunction with the accompanying drawings, in which:
FIG. 1 is a sectional view showing the relation between an inherent proof
stress of a pile and a constructional proof stress of the constructed pile;
FIG. 2 is a sectional view showing the structure of a reinforcement pile
having a reinforcement part provided at one end thereof;
FIG. 3 is a sectional view showing the structure of a reinforcement pile
having reinforcement parts provided at both ends thereof;
FIG. 4 is a sectional view showing the structure of a reinforcement pile
having a reinforcement disk attached to one end of a conventional pile, for
example, a pre-tensioned spun high strength concrete (PHC) pile;
FIG. 5 is a sectional view showing a reinforcement pile having
reinforcement wings for supporting the protrusion part of the reinforcement disk
shown in FIG. 4;
FIG. 6 is a sectional view showing a water-discharging hole formed in
the reinforcement disk according to the present invention;
FIG. 7 is a flow chart illustrating a constructing method of a headextended
pile using a casing in the ground having collapsible soil when the ground
is bored;
FIG. 8 is a sequential view showing a constructing method of a headextended
pile using a casing in the ground having collapsible soil when the ground
is bored;
FIG. 9 is a flow chart illustrating a constructing method of a headextended
pile in the ground having uncollapsible soil when the ground is bored;
and
FIG. 10 is a sequence view showing a constructing method of a headextended
pile in the ground having uncollapsible soil when the ground is bored.
[Best Mode]
Now, preferred embodiments of the present invention will be described
in detail with reference to the accompanying drawings.
FIG. 2 is a sectional view showing the structure of a reinforcement pile
having a reinforcement part provided at one end thereof. As shown in FIG. 2, a
head-extended pile 2 comprises a cylindrical pile part 12 and a lower
reinforcement part 20. The lower reinforcement part 20 comprises a lower
reinforcing member 21 and a lower conical member 22.
The cylindrical pile part 12 has a diameter of 350, 400, 450, 500, or 600
mm, and the cylindrical pile part 12 may be composed of a concrete pile, a PHC
pile, a steel tube, a H-type beam, a composite tube, or a wood pile.
The lower reinforcing member 21 may be integrally formed with the
lower end of the cylindrical pile part 12 or securely fixed to the lower end of the
cylindrical pile part 12 by means of a fixing unit. The lower reinforcing member
21 is a disk-shaped structure of a prescribed thickness. The lower conical member
22 has a prescribed slope surface connected between the end of the cylindrical pile
part 12 and the end of the lower reinforcing member 21.
Table 1 shows dimensions and dynamism of the pile.
(Table Removed) It can be seen from Table 1 that a front end bearing force of 58 tf is
necessary to obtain an inherent proof stress of 89 tf in the case of the O 350 PHC
pile. However, a front end bearing force of 58 tf cannot be obtained because the
cross-sectional area of the conventional pile having a diameter of 350 mm is
961.625 cm2. Consequently, it is required that a cross-sectional area of the front
end of the pile be 1759 cm2 to obtain a front end bearing force of 58 tf. In other
words, it is required that the diameter of the reinforcement part be increased to
473 mm.
Referring to Table 1, it is required that the cross-sectional areas of the
front ends of O 400, O 450, and O 500 PHC piles be increased to 2216 cm2, 2707
cm2, and 3419 cm2, respectively, to fully utilize the inherent proof stress of the
respective piles. To this end, it is required that the diameters of the reinforcement
parts of the piles be increased to 531 mm, 587 mm, and 660 mm, respectively.
Preferably, the diameter (D) of the lower reinforcing member 21 is equal
to the thickness (T) of the lower reinforcing member 21. The slope ratio of the
lower conical member 22, i.e., the ratio of the protrusion width (a) to the slope
width (b), is selected within a range of 1:1 ~ 10. Preferably, the ratio of the
protrusion width (a) to the slope width (b), is 1:6.
FIG. 3 is a sectional view showing the structure of a reinforcement pile
having reinforcement parts provided at both ends thereof. As shown in FIG. 3, the
dual-side reinforcement pile comprises a cylindrical pile part 12, a lower
reinforcement part 20 formed at the lower end of the cylindrical pile part 12, and
an upper reinforcement part 30 formed at the upper end of the cylindrical pile part
12. The upper reinforcement part 30 comprises an upper reinforcing member 31
and an upper conical member 32 in the same manner as the lower reinforcement
part 20 of FIG. 2. Also, the upper reinforcement part 30 has the same shape and
size as the lower reinforcement part 2.0.
FIG. 4 is a sectional view showing the structure of a reinforcement pile
having a reinforcement disk attached to one end of a conventional pile, for
example, a pre-tensioned spun high strength concrete (PHC) pile. As shown in
FIG. 4, the reinforcement pile comprises a cylindrical pile part 12 and a
reinforcement disk 40. The cylindrical pile part 12 has a diameter of 350, 400,
450, or 500 mm, and the cylindrical pile part 12 may be composed of a concrete
pile, a PHC pile, or a steel tube. The reinforcement disk 40 is made of iron.
The reinforcement disk 40, having a disk-shaped structure of a prescribed
thickness, is securely fixed to the lower end of the cylindrical pile part 12 by
means of a fixing unit. In the case that the cylindrical pile part 12 is composed of
the steel tube, the reinforcement disk 40 can be securely fixed to the lower end of
the cylindrical pile part 12 by welding. In the case that the cylindrical pile part 12
is composed of the concrete pile or the PHC pile, on the other hand, the cylindrical
pile part 12 is provided at the lower end thereof with an iron disk 41, which
surrounds the lower end of the cylindrical pile part 12, and the reinforcement disk
40 can be securely fixed to the iron disk 41 by welding with the result that the
reinforcement disk 40 is securely fixed to the cylindrical pile part 12.
Table 2 shows dimensions and dynamism of the pile and the
reinforcement disk.
(Table Removed)It can be seen from Table 2 that a front end bearing force of 58 tf is
necessary to obtain an inherent proof stress of 89 tf in the case of the $ 350 PHC
pile. However, a front end bearing force of 58 tf cannot be obtained because the
cross-sectional area of the conventional pile having a diameter of 350 mm is
961.625 cm2. Consequently, it is required that a cross-sectional area of the front
end of the pile be increased to obtain a front end bearing force of 58 tf. In Table
2, the cross-sectional area of the reinforcement disk is 1759 cm2, the diameter of
the reinforcement disk is 473 mm, and the thickness of the reinforcement disk is
10.8mm.
It can also be seen from Table 2 that the cross-sectional areas of the
reinforcement disks are increased to 2216 cm2, 2707 cm2
5 and 3419 cm2,
respectively, to fully utilize the inherent proof stress of the respective piles. Also,
the diameters of the reinforcement disks are increased to 531 mm, 587 mm, and
660 mm, respectively. Table 2 reveals that the thickness of the reinforcement disk
is increased as the protruded length of the reinforcement disk is increased.
FIG. 5 is a sectional view showing a reinforcement pile having
reinforcement wings for supporting the protrusion part of the reinforcement, disk
shown in FIG. 4. When the protruded length of the reinforcement disk 40
extending outward from the cylindrical pile part 12 is large or the thickness (t) of
the reinforcement disk 40 is small, the outer edge of the reinforcement disk 40
may be bent upward.
As a result, the effective cross-sectional area of the reinforcement disk 40
is reduced, and thus the front end bearing force is reduced. In order to prevent this
phenomenon, a plurality of reinforcement wings 50 are provided between the
reinforcement disk 40 and the cylindrical pile part 12, as shown in FIG. 5.
Preferably, each reinforcement wing 50 is a triangular iron plate. The
reinforcement wings 50 are disposed on the upper surface of the reinforcement
disk 40 while being spaced a prescribed distance from each other in such a manner
that the reinforcement wings 50 arranged around the cylindrical pile part 12. The
reinforcement wings 50 can be securely fixed to the reinforcement disk 40, for
example, by welding because the reinforcement wings 50 and the reinforcement
disk 40 are made of iron.
In the case of the PHC pile, the reinforcement wings 50 are securely fixed
to the iron disk 41 surrounding the lower end of the cylindrical pile part 12 by
welding. In the case of the steel pile, on the other hand, the reinforcement wings
50 are directly fixed to the outer circumference of the steel pile by welding.
The enlarged perspective view of the circle of FIG. 5 shows the shape
and connection of the reinforcement wings 50.
Through the center of the reinforcement disk 40 is formed a waterdischarging
hole 52, by which the head-extended pile 2 is prevented from rising
due to seepage of water. The seepage water is introduced into a hollow part 54
defined in the head-extended pile.
A method for constructing the head-extended pile with the above-stated
construction according to the present invention will now be described. When a
hole is bored in the ground having collapsible weathering belt, a casing 56 is used
to prevent the wall of the hole from collapsing. The hole is bored up to the upper
end of the soil layer where the pile driving operation of a pile-driving machine 58
can be carried out, and then the pile is driven into the supporting layer.
Consequently, when a hole is bored in the ground having collapsible soil,
a head-extended pile 2 suitable to proof stress is selected. In the case of the PHC
pile, a front-closed shoe is used. In the ground having a high water level, the
water-discharging hole 52 is formed through the center of the reinforcement disk
50 so that the head-extended pile 2 is prevented from rising from the water level
in the hole when the head-extended pile 2 is penetrated into the ground by means
of its own weight.
The pile-driving machine 58 and other equipment are inspected on the
basis of the ground to check whether they are normal or not. After the depth of
the bored hole is estimated, marks are indicated on the pile every 50 cm from the
upper end of the weathering belt and every 20 cm near the supporting layer.
At this time, the upper end of the weathering belt is established on the
basis of an N value of 50/20 ~ 10. The trial pile driving method is preferably
carried out to estimate the upper end of the weathering belt, although such
estimation may be basis of a geological survey report, an RPM value of the
machine, or the discharged amount of soil.
The diameter of the casing 56 is preferably 500 mm larger than the
diameter of the head-extended pile 2. The safety of the pile-driving machine 58
has a great effect on the construction of the pile. Consequently, perpendicularity
of a screw auger 62 when being penetrated affects the pile-driving machine 58
when the pile is driven by means of the pile-driving machine 58. In some cases,
an accident may occur when the pile is driven.
Also, the mixing ratio of water to cement is 1:1, and approximately 40 kg
of cement is compounded per meter. The mixed cement is transferred at high
pressure, and thus relevant equipment, such as a mixer plant, a mix measuring
unit, and a compressor, which are not shown in the drawings, are placed in the
same place so that the equipment can be easily and conveniently managed.
Obstructions on or in the ground are removed.
As described above, the pile is selected, the pile driving operation is
prepared and checked, and the obstructions are removed (S10).
When the pile-driving machine 58 is installed (S20), a lining board is laid
or stones are spread out to reinforce the ground if the pile-driving machine 58 may
tilt or move during the pile driving operation because the ground is soft and weak.
In this way, the ground to be constructed is inspected and reinforced, if necessary,
before the pile-driving machine 58 is installed (S20).
Perpendicularity of the casing 56, the screw auger 62 and a reader 64 is
checked at the front and at the side, and then the position of the casing 56, the
screw auger 62 and the reader 64 is fixed (S30).
In order to protect the wall of the bored hole and prevent blockage of the
discharging hole, the screw auger 62 is inserted into the casing 56, and then
excavation is carried out in such a manner that the screw auger 62 is rotated in the
forward direction and the casing 56 is rotated in the reverse direction. The hole is
excavated earlier by means of the front end of the screw auger 62 than the casing
56. Slime is discharged by means of high-pressure air supplied from the front end
of the screw auger 62.
The casing 56 is penetrated into the ground until the casing 56 reaches a
soil layer where the wall of the hole is not collapsible, and the casing 56 is
penetrated to.an N value of 50/20 ~ 10 (near the weathering belt).
The soil layer in the ground where the pile can be driven is checked on
the basis of the geological survey report. Also, the soil layer is accurately checked
through the preparation of a section of the soil layer of the geological survey
lengthwise and breadthwise. The prepared sectional view of the soil layer is
compared with the result of the trial pile driving operation to indicate a predictive
penetration depth of the pile on the sectional view. In this way, the geological
survey report is prepared.
When the pile reaches the soil layer where the pile can be driven, the
excavation speed of the screw auger 62 is maintained at a constant speed, and
RPM is recorded. The method for checking the soil layer where the pile can be
driven by means of the RPM is not accurate due to uncertainty of the soil layer.
Consequently, the RPM method is used only for reference in the field. A column
diagram is accurately prepared, and then the prepared column diagram is
compared to the predictive penetration depth of the pile to check used current of
an auger motor.
The soil discharged by means of the screw auger 62 is mixed, and thus
the nature of soil cannot be accurately checked. Consequently, the soil layer is
estimated through comparison with the geological survey report to check the
discharged soil.
The trial pile driving operation is carried out at several places, if possible,
considering the field circumstances and the machine penetration conditions to
exactly record the status of the soil layer and mark the predictive penetration depth
of the pile. In this way, the main pile driving operation is prepared. When the
trial pile driving operation is carried out, the operation is carried out at least twice
every house, and the operation is carried out within a distance of 30 m in.the case
of a parking place. Preferably, the trial pile driving operation is carried out as
several times as possible.
Also, the result of the trial pile driving operation is indicated on the
arrangement view and the sectional view so that the position and the range where
the pile can be driven are indicated and thus used in the field. The lower the
excavation speed is, the better the result. When the screw auger is rotated in the
reverse direction while the excavation is carried out, the soil attached to the screw
auger 62 is dropped into the hole. Consequently, it is necessary that the screw
auger not be rotated in the reverse direction.
As described above, the soil layer where the pile can be driven is checked
on the basis of the excavation, the geological survey report, the used current of the
auger motor, the discharged amount of soil, and the trial pile driving operation,
and then the excavation is carried out by means of the casing 56 and the screw
auger 62 (S40).
The previously prepared cement paste mixer, the compressor, and the
generator are placed in the same place. The pouring of material is carried out such
that water is poured, and then cement is poured. The front end of the pile is
penetrated by means of a subsequent pile driving operation. Consequently, the
mixture of cement (40 kg/m) and water in a 1:1 ratio is poured into the bored hole
(S50).
After the mixture of the cement and the water, i.e., cement paste 66 is
prepared, the casing 56 for protecting the wall of the hole is left as it is until the
cement past 66 is poured. The cement paste 66 is injected at high pressure while
the screw auger 62 is slowly withdrawn (S60).
After that, the cement paste 66 is mixed with the surrounding soil to
increase the surrounding frictional force. Most of the proof stress of the headextended
pile 2 is derived from the front end supporting force. Consequently, the
screw auger 62 is penetrated again to stir the cement paste 66 and treat the slime
(S70).
At this time, attention is paid to the penetration depth so that the screw
auger 62.does not damage the supporting foundation when the screw auger 62 is
inserted.
After that, the screw auger 62 is withdrawn again as slowly as possible
(S80).
Subsequently, the head-extended pile 2 is erected such that the center of
the head-extended pile 2 exactly corresponds to the center of the bored hole, and
then the head-extended pile 2 is penetrated by means of its own weight. When the
head-extended pile 2 is penetrated, the cement paste 66 may overflow out of the
bored hole. In order to prevent this phenomenon, the pile is slowly penetrated
(S90).
After the head-extended pile 2 is penetrated, the upper end of the pile is
fixed to the front end of the screw auger 62 (S100), and then the casing 56 is
slowly withdrawn (SI 10).
After that, a shock-absorbing member, not shown in the drawings, is
placed at the front end of the head-extended pile 2, and then a ram freely drops to
penetrate the pile. The final driving operation is carried out while the upper end
of the pile is held such that error of the vertical movement of the ram is corrected
depending upon the circumstances of the field (SI 20).
When the pile is driven, attention is paid to perpendicularity and shake of
the pile, and destruction of the front end of the pile. When the perpendicularity of
the pile is changed while the pile is driven, the pile may be destroyed or the proof
stress of the pile affected.. Consequently, it is required that the pile be driven ,
while the center of the pile exactly corresponds to the center of the ram.
When it is determined that the pile reaches the predicted level of the
supporting layer as the result of the pile driving operation (the average penetration
depth per pile driving operation is approximately 5 to 10 mm), the operation of the
pile driving machine 58 is stopped for a while, and then a sinking amount
recording device is installed. After the sinking amount recording device is
installed, the pile driving operation is initiated again to measure the penetration
amount and the rebound amount (SI30).
Another method for penetrating the head-extended pile into the ground
having collapsible soil when the hole is bored will now be described. The pile is
selected, the pile driving operation is prepared and checked, and the obstructions
are removed (S200). The ground to be constructed is inspected and reinforced, if
necessary, and then the pile-driving machine 58 is installed (S210).
Perpendicularity of the screw auger 62 and the reader 64 is checked at the
front and at the side, and then the position of the screw auger 62 and the reader 64
is fixed (S220). The soil layer where the pile can be driven is checked on the
basis of the excavation, the geological survey report, the used current of the auger
motor, the discharged amount of soil, and the trial pile driving operation, and then
the excavation is carried out by means of the screw auger 62 (S230).
After that, water and cement are mixed with each other by means of an
exclusive mixer (not shown) to obtain cement paste (S240). After the screw auger
62 is withdrawn (S250), the cement paste 66 is injected at high pressure (S260).
The screw auger 62 is penetrated again to stir the cement paste 66 and
treat the slirne (S270). Subsequently, the head-extended pile 2 is erected, and then
the head-extended pile 2 is penetrated by means of its own weight (S280). At this
time, the pile is slowly penetrated so that the cement paste 66 does not overflow
out of the bored hole.
After that, a shock-absorbing member, not shown in the drawings, is
placed at the front end of the head-extended pile 2, and then pile driving operation
is carried out. The final driving operation is performed at a height of 2 m to
obtain the final sinking amount (S290).
When it is determined that the pile reaches the predicted level of the
supporting layer as the result of the pile driving operation (the average penetration
depth per pile driving operation is approximately 5 to 10 mm), the operation of the
pile driving machine 58 is stopped for a while, and then a sinking amount
recording device is installed. After the sinking amount recording device is
installed, the pile driving operation is initiated again to measure the penetration
amount and the rebound amount, and thus the final sinking amount (S300).
Those skilled in the art will appreciate that any constructing method
using the head-extended pile according to the present invention falls into the scope
of the invention irrespective of whether the method is applied to the ground
having collapsible soil when the ground is bored or the method is applied to the
ground having uncollapsible soil when the ground is bored.
For example, a constructing method of the head-extended pile wherein
the head-extended pile is directly driven so that the pile is penetrated, a
constructing method of the head-extended pile wherein the head-extended pile is
inserted and then directly driven or securely located after the excavation is
finished, a constructing method of the head-extended pile wherein the headextended
pile is directly penetrated while the head-extended pile is inserted in any
one of a steel tube, a concrete tube, a synthetic resin tube, and a wood tube, and a
constructing method of the head-extended pile wherein the head-extended pile is
penetrated through the use of hydraulic pressure, pneumatic pressure, or pressure
generated by chemical means, all fall under the scope of the present invention.




We claim:
1. A head-extended pile (2) for supporting load of a structure, wherein the pile has a cylindrical pile
part, a reinforcement member (20) provided at the lower or front end of the pile and a reinforcing
member (21) provided at the upper or rear end of the pile , the reinforcement members having a
diameter larger than that of the pile (2) so that the front and rear end supporting force of the pile is
increased, said reinforcement members vertically extending from opposite ends of the pile, said
reinforcing members having respective lowermost and uppermost portions with a larger dimension than
that of the pile and a transitional portion which extends from the outer circumference of the pile to said
lowermost and uppermost portions, said transitional portion having a configuration which comprises
plurality of triangular reinforcing wings disposed around the pile while being spaced a prescribed
distance from each other wherein the reinforcing members are integral or fixedly attached to the pile,
and wherein said reinforcement members comprise:
an iron disk (41) having a prescribed depth and an inner diameter equal to the diameter of a cylindrical
pile part;
a reinforcing disk (40) attached to the iron disk (41), the reinforcing disk (40) having a diameter larger
than that of the iron disk (41); and
said reinforcing wings (50) being attached to the outer circumference of the iron disk (41) and to the
upper surface of the reinforcing disk, wherein the reinforcing disk (40) has a water-discharging hole
(52) formed through the center of the reinforcing disk (40).
2. The head-extended pile as claimed in claim 1, wherein the diameter of the lower reinforcing member is equal to thickness of the lower reinforcing member and the slope ration transitional portion is within the range 1:1 to 1:10.
3. The head-extended pile as claimed in claim 1, wherein the pile is a solid concrete pile or a steel pile.
4. A constructing method of a head-extended pile, as claimed in claim 1, in the ground composed of collapsible soil when the ground is bored, comprising the steps of:
selecting a pile, preparing and checking a pile driving operation, and removing obstructions (S10);
inspecting the ground to be constructed, reinforcing the ground, and installing a pile-driving machine
(S20);
checking perpendicularity of a casing or a screw auger and a reader at the front and at the side to fix the
position of the casing (S30);
checking a soil layer where the pile can be driven on the basis of excavation, a geological survey
report, used current of an auger motor, the discharged amount of soil, and a trial pile driving operation
so that the excavation is carried out by means of the casing and the screw auger (S40);
mixing water and cement by means of an exclusive mixer to obtain cement paste (S50);
injecting cement paste at high pressure after the screw auger is withdrawn (S60);
penetrating the screw auger again to stir the cement paste and treat the slime (S70);
slowly withdrawing the screw auger (S80);
erecting the head-extended pile so that the head-extended pile is penetrated by means of its own weight
(S90);
slowly withdrawing the casing while the upper end of the pile is fixed by means of the screw auger
(S100); and
driving the head-extended pile so that the pile can be penetrated (S110).
5.A constructing method of a head-extended pile, as claimed in claim 1, in the ground composed of
uncollapsible soil when the ground is bored, comprising the steps of:
selecting a pile, preparing and checking a pile driving operation, and removing obstructions (S200);
inspecting the ground to be constructed, reinforcing the ground, and installing a pile-driving machine
(S210);
checking perpendicularity of a screw auger and a reader at the front and at the side to fix the position of
the screw auger (S220);
checking a soil layer where the pile can be driven on the basis of excavation, a geological survey
report, used current of an auger motor, the discharged amount of soil, and a trial pile driving operation
so that the excavation is carried out by means of the screw auger (S230);
mixing water and cement by means of an exclusive mixer to obtain cement paste (S240);
withdrawing the screw auger (S250);
injecting the cement paste at high pressure (S260);
penetrating the screw auger again to stir the cement paste and treat the slime (S270);
erecting the head-extended pile so that the pile is penetrated by means of its own weight (S280); and
driving the head-extended pile so that the pile can be penetrated (S290).
6. A constructing method of a head-extended pile as claimed in claim 1 wherein the head-extended pile is directly driven so that the pile is penetrated.
7. A constructing method of a head-extended pile as claimed in claim 1 wherein the head-extended pile is inserted and then directly driven or securely located after the excavation is finished.
8. A constructing method of a head-extended pile as claimed in claim 1 wherein the head-extended pile is directly penetrated while the head-extended pile is inserted in any one of a steel tube, a concrete tube, a synthetic resin tube, and a wood tube.
9. A constructing method of a head-extended pile as claimed in claim 1 wherein the head-extended pile is penetrated through the use of hydraulic pressure, pneumatic pressure, or pressure generated by chemical means.

Documents:

5313-DELNP-2006-Abstract-(17-02-2012).pdf

5313-delnp-2006-abstract.pdf

5313-DELNP-2006-Claims-(17-02-2012).pdf

5313-delnp-2006-Claims-(31-07-2013).pdf

5313-delnp-2006-claims.pdf

5313-DELNP-2006-Correspondence Others-(17-02-2012)..pdf

5313-DELNP-2006-Correspondence Others-(17-02-2012).pdf

5313-delnp-2006-Correspondence Others-(31-07-2013).pdf

5313-delnp-2006-correspondence-others 1.pdf

5313-delnp-2006-Correspondence-Others-(21-11-2013).pdf

5313-delnp-2006-correspondence-others.pdf

5313-delnp-2006-description (complete).pdf

5313-delnp-2006-drawings.pdf

5313-DELNP-2006-Form-1-(17-02-2012).pdf

5313-delnp-2006-form-1.pdf

5313-delnp-2006-Form-13-(31-07-2013).pdf

5313-delnp-2006-form-18.pdf

5313-DELNP-2006-Form-2-(17-02-2012).pdf

5313-delnp-2006-form-2.pdf

5313-DELNP-2006-Form-3-(17-02-2012).pdf

5313-delnp-2006-form-3.pdf

5313-delnp-2006-form-5.pdf

5313-delnp-2006-GPA-(31-07-2013).pdf

5313-delnp-2006-pct-210.pdf

5313-DELNP-2006-Petition-137-(17-02-2012)-1.pdf

5313-DELNP-2006-Petition-137-(17-02-2012).pdf


Patent Number 257989
Indian Patent Application Number 5313/DELNP/2006
PG Journal Number 48/2013
Publication Date 29-Nov-2013
Grant Date 25-Nov-2013
Date of Filing 14-Sep-2006
Name of Patentee SONG YOON-YANG
Applicant Address 2-409, GWANGJINMOKWHA APT., 585, 1-GA, SAMCHEON-DONG, WANSAN-GU, JEONJU-SI, JEOLLABUK-DO 560-290, REPUBLIC OF KOREA.
Inventors:
# Inventor's Name Inventor's Address
1 SONG YOON-YANG 2-409, GWANGJINMOKWHA APT., 585, 1-GA, SAMCHEON-DONG, WANSAN-GU, JEONJU-SI, JEOLLABUK-DO 560-290, REPUBLIC OF KOREA.
PCT International Classification Number E02D 5/48
PCT International Application Number PCT/KR2004/001048
PCT International Filing date 2004-05-06
PCT Conventions:
# PCT Application Number Date of Convention Priority Country
1 10-2004-0019102 2004-03-20 Republic of Korea