Title of Invention

A CRYOGENIC FLUID OFFLOADING SYSTEM

Abstract The invention relates to a cryogenic fluid offloading system,having a tanker vessel(2) moored in line with an offshore mooring construction (4,8)and connected to a processing unit,such as regasification plant(13).The regasification plant (13) has no large storage facilities,the tanker(2) being unloaded in dependence on onshore demand of gas.
Full Text

Weathervaning LNG offloading system
The invention relates to a cryogenic fluid offloading system comprising:
an offshore mooring structure, connected to the seabed,
a connecting member that is attached to the mooring structure with a first
end to be displaceable around a vertical axis,
a tanker vessel for loading cryogenic fluid at a'first location, transporting it
and offloading the cryogenic fluid at a second location, the tanker vessel
being connected to the mooring structure via the connecting member,
a first fluid duct connected to the mooring structure, for supplying fluid
away from the mooring structure,
a second fluid duct connected to the mooring structure, for transporting
fluid coming from the tanker vessel to the mooring structure,
a processing unit for receiving a cryogenic fluid in liquid phase from the
tanker vessel and for supplying a gaseous phase of the fluid to the first fluid
duct, and
fluid supply means for controlling supply of cryogenic fluid from the tanker
vessel to the processing unit.
A weathervaning LNG offloading system is known from Zubiate, Pomonic,
Mostarda, Ocean Industry, November 1978, page 75-78.
The known mooring structure comprises an articulated riser tower with a
buoyancy chamber that is attached to a piled base via a universal joint. The top part of
the riser tower projects above water level and is connected to a triangular mooring yoke
via a tri-axial swivel and universal joint. The yoke is connected in two hinges to the
stem of a floating LNG regasification barge. The yoke transporting LNG vapour to the
tower riser system carries two cargo pipes. Thejanker vessel is moored alongside the
LNG barge, which has substantially the same length as the tanker.
Even though the combined tanker and LNG regasification barge can weathervane
around the mooring tower, the offloading situation during weathervaning is relatively
■*>■ *
unstable. The tanker will therefore be docked to the regasification barge for a short
period of time as possible and completely transfer its LNG to LNG storage facilities.
Next, the tanker is decoupled from the barge and will leave to collect a next cargo,

while the LNG stored in the regasification barge storage tanks is regasified and supplied through the pipeline extending from the riser tower along the seabed to shore.
It is ah object of the present invention to provide a cryogenic fluid offloading system in which a tanker can be moored to the offshore mooring structure for a longer period of time in a stable weathervaning position.
It is a further object of the present invention to provide for a cryogenic fluid offloading system, which can employ a relatively small size regasification plant.
It is again another object of the present invention to provide a cryogenic fluid offloading system that can be easily produced and installed.
Thereto, the offshore cryogenic fluid offloading system according to the present invention is characterised in that the connecting member is connected with a second end to the tanker vessel, the mooring structure being at least substantially in line with the tanker vessel to allow displacement of the tanker vessel around the vertical axis, control means being provided for opening and closing of the fluid supply means on the basis of a predetermined supply of the gaseous phase through the first duct.
By attaching a tanker vessel in line to the mooring structure, a stable weathervaning situation is obtained. Weathervaning by displacement of the connecting member around the vertical axis can be through angles of ± 180° or through smaller angles such as 90° or less, and can be in a single direction or in two directions, depending on prevailing wind and current conditions. According to the invention, the tanker vessel acts as the main LNG storage structure, which unloads LNG to the regasification plant only when there is demand from onshore, for instance from a power plant. When there is no onshore demand, the tanker is not being offloaded. Hence, the regasification plant need not have large LNG storage facilities and can be of relatively small size. Small buffer storage will suffice to ensure continued gas supply to shore when the tanker has been offloaded and is exchanged with another tanker. The buffer storage on the regasification plant can be of equal volume, preferably smaller than half of the volume or 1/3 of the "volume of the LNG storage tanker of the tanker. Thereby, it is possible to moor the small size regasification plant alongside or at the bow of the tanker vessel, such that the weathervaning behaviour of the combined tanker and regasification plant is not affected in a negative manner.
Furthermore, the offloading system of the present invention can be easily installed by onshore construction of the regasification plant with the connecting

member, which may be a space frame, floating it to the pre-installed mooring structure and connecting the regasification plant and connection member to the mooring structure*
In one embodiment, the connection member is an arm, for instance a space frame, having a longitudinal section that is with one end connected at or near the midpoint of the tanker vessel. The arm extends in the length direction along the vessel towards the mooring structure and has a transverse section attaching to the mooring structure. The transverse arm section allows the tanker vessel to be placed in line with the mooring structure so that it can weathervane under the influence of wind and current conditions around the mooring structure. The longitudinal section of the arm preferably is at least 1/3, more preferably at least 1/2 of the length of the tanker vessel, such that it can be connected near the midship position. The arm supports the LNG-duct, which may be rigid or which may comprise flexible piping. By means of the arm, according to the present invention, regular tanker vessels can be employed with midship loading and offloading facilities to be moored to the offloading system of the present invention and to be used as a storage facility for the regasification plant
In one embodiment, the longitudinal section of the mooring arm is at its end, near the midship position of the vessel, provided with a floating structure for supporting the weight of the arm. On the floating structure, the regasification plant may be placed so that it is moored along side the vessel. The dimensions of the fldating structure and the regasification plant supported on the floating structure are not more than 2/3 preferably not more than 1/2 of the length of the tanker vessel.
The transverse part of the mooring arm may be connected to a buoy, which is provided with a turntable that is anchored to the seabed so that the buoy can weathervane around the stationary mooring lines. In one embodiment, the regasification plant is placed on said buoy. Alternatively, the mooring structure may comprise a tower, placed on the seabed, having a fender system in the form of a vertical arm and weights depending from the vertical arm above or below sea level. A buoy is connected to the fender weights via a transverse rod. The regasification plant is placed on the buoy, which is attached to the transverse section of the mooring arm.
In again another embodiment, the regasification plant is placed on a tower above water level, the transverse section of the mooring arm being attached to a buoy that is connected to the tower via a soft yoke construction or via a rotatable hinging

for the regasification plant 13 and is moored to the mooring structure 3 for a longer or shorter period, depending on the demand for gas supply through pipe line 16. As no substantial additional storage facilities are required for the regasification plant 13, it can be of relatively small size so that it can be moored alongside the vessel 2 without affecting the weathervaning capacities of the tanker 2.
In the embodiments, shown in Fig. 1 and 2, the transverse frame section 21 is shown to extend perpendicular to the longitudinal frame section. It is, however, also possible to have the transverse frame section 21 extend at a lesser angle to the longitudinal frame section. Again, alternatively the transverse arm section 21 could be omitted in case of a large diameter buoy 4, the longitudinal arm section 20 in that directly connecting to the side of such large diameter buoy 4. In order to guarantee a continuation of gas supply from the regasification unit 13 to onshore, upon exchange of a tanker when the old tanker is empty and a new tanker will be moored or when environmental conditions require disconnecting of the tanker. Buffer storage tanks for LNG can be placed on the floating unit 12 of the regasification unit 13 or on a mooring tower such as shown in Fig. 3, 8 and 9. The buffer tanks on the regasification unit are no larger than the volume of the tanker, preferably not larger than half the volume, more preferably not larger than 1/3 of the volume.
Fig. 3 shows an embodiment wherein the regasification plant 13 is placed on a
buoy 34. The buoy 34 is attached to the transverse section 21 of'the frame 10. It should
be noted that in case the buoy 34 is of the same width dimension as the vessel 2, only a
i longitudinal frame section 20 is sufficient for connecting the fluid duct 14 to the
midship position of the vessel 2. The first end 22 of the frame 10 is attached to a floater
32 for horizontally positioning the arm 10 alongside the tanker 2. The second end 23 of
the frame 10 is attached to the buoy 34. The buoy 34 is attached to a tower 35 placed
on the seabed 6 and projecting above water level. The tower 35 comprises a transverse
arm 40 from which weights 41, 42 depend from rods or cables 43. The buoy 34 is
connected to the weights 41,42 via arms 44,45.
Again, the longitudinal centreline 24 of the vessel 2 intersects the vertical axis 39
so that the vessel 2 can weathervane through about ± 90° around the vertical axis 39.
Upon weathervaning, the weights 41, 42 will be deflected and provide a restoring force
on the vessel 2 driving it back to assume its equilibrium position. The fluid duct 14 is
attached to the regasification plant 13 for supplying LNG to the plant. An outlet of the

plant 13 is connected via flexible riser 46 to a vertical gas duct which is incorporated within or alongside the tower 35 and which connects at the bottom thereof to pipe line 16 for transport of gas to the shore.
In an alternative embodiment, the fluid supply means 31 may also be connected to the duct 14 at the side of the regasification plant 13.
In the embodiment shown in Fig. 5, the arm 10 is attached to a buoy 51 having a central shaft 52. The regasification plan 13 is placed on'the buoy 51. A submerged tower 50 anchors the buoy 51 via cables 54 and weights 55 providing a fender system, which restores the position of the buoy 51 upon rotation or drift relative to the tower 50. A flexible gas line 53 extends through the shaft 52 and connects the regasification plant 13 to the tower 50 and is, via the tower 50, in fluid connection with pipe line 16.
In the embodiment shown in Fig. 6, the arm 10 is connected to outer ring 62 of a buoy 65. On the buoy 65, the regasification plant 13 is supported. The outer ring 62 can rotate via axial / radial bearings 63 around the inner, stationary part 61 of the buoy 65. The inner part 61 is anchored to the seabed 6 via anchor lines 64. A flexible fluid line 66 connects the gas pipe 16 to the regasification plant 13. The tanker vessel 2 can weathervane through 360 degrees around vertical axis 69.
In the embodiment in Fig. 7, the buoy 72 supporting the regasification plant 13 is
at its bottom provided with a turntable 73 to which anchor lines 74 are connected. The
i buoy 72 can rotate with respect to the turntable 73 via bearings, which are not disclosed
in detail herein.
In the embodiment shown in Fig. 8, a tower 35 of similar construction as shown
in Fig. 3 and 4 is used, comprising restoring weights 42, depending from arms 40
connected to arms 45. A floating construction 80 supports the second end 23 of the arm
10 whereas floating structure 32 supports first end 22 of arm 10. The gas pipe line 16 is
connected to LNG-duct 14 via an articulated arm 81 comprising a first section 82
extending in a substantially horizontal orientation and a second section 83 depending
vertically from the first section 82. The arms 82, 83 have articulations 84, 85, 86, which
may comprise seven swivel joints, such as described in European patent application no
01202973.2, in the name of the applicant. The arms 82, 83 may be hollow arms
comprising the LNG-duct or may the arms along which the LNG-duct is guided
externally.

Fig. 9 discloses an embodiment wherein the second end 23 of the arm 10 is connected to the tower 35 in a pivot joint 91. A collar 92 around the tower 35 allows rotation around vertical axis 99.
The offloading system, as described above, may be easily installed by onshore construction of the mooring arm 10 and connecting it to the floating regasification plant 13 of relatively small size. Separately, the mooring structure, such as tower 35, can construct at the mooring site. The regasification plant, together with the floating arm 10, can be transported to the site of the tower together and can there be connected, during which the regasification plant can remain on the floating structure, such as shown in the embodiments of Fig. 1-7 or can be transferred to the mooring tower, such as shown in the embodiments of Fig. 8 and 9.
As can be seen from Fig. 10, a support structure 102 placed on the tower 35 carries the mooring arms 104, 104' and 105, 105'. The horizontal mooring arms 105, 105' are with their restoring end parts 115, 115f connected to a respective vertical arm 104,104' via articulation joints 116,116'. Two counterweights 106,106! are connected to tiie restoring end parts 115, 115' of each arm 105, 105'. The articulation joints 116, 116' may for instance comprise three perpendicular circular bearings, or ball-joints allowing rotation around a vertical axis 117 (yaw), a transverse axis 118 (pitch) and a longitudinal axis 119 (roll).
The vertical mooring arms 104, 104' are at their upper .ends connected to the support structure 102 in articulation joints 122, 1221 allowing rotation of the arms 104, 104' around a transverse axis 123 and a longitudinal axis 124. At the coupling end part 125, the arms 105, 105f are provided with a mechanical connector 113 (Fig. 11) allowing rotation around a vertical axis 126 (yaw), a longitudinal axis 127 (roll) and a transverse axis 128 (pitch). The mechanical connector is not shown in detail but may be formed by a construction such as described in US-4,876,978 in the name of the applicant, which is incorporated herein by reference.
Fig. 11 shows the mooring arms 105 that are placed in a substantially vertical position via a cable 130 attached to the coupling end part 125 of the arms 105, 1051 and connected with its other end to a winch (not shown) on the tower 35. Two rigid pipes 131, 132 extend from the tower 35 to a swivel connection 133, 134 on the support structure 102. From the swivel connections 133, 134 two vertical pipes 135, 136 extend downwardly to swivel connections 137, 138 (see Fig. 12). Two horizontal cryogenic

transfer pipes 139,140 extend along the arms 105, 105' to swivel connections 141,142 on the mechanical connector 113. A fluid connector 143 is provided on the mechanical connector 113.
During connecting of the mooring arms 105, 1051 to the vessel 2, the vessel 2 may be connected to the tower 35 via a hawser 144. Via a pilot line 145, the mechanical connector 113 can be lowered and placed into a receiving element 146 on deck of the vessel 2. By paying out cable 130, the horizontal arm 105 pivots in articulation joints 116,116* around the transverse axis 118. The vertical ducts 135,136 can pivot around a transverse axis 123 in articulation joints 133,134 and in articulation joints 137,138 as shown in Fig. 12 to assume a substantially vertical position.
The horizontal ducts 139, 140 will also pivot around a vertical axis at swivels 137', 1381 and a transverse axis a horizontal axis and a vertical arm at the position of two sets of each three perpendicular swivels 141, 142 until the mechanical connector 113 mates with receiving element 146 as shown in Fig. 12. After locking the mechanical connector 113, the fluid connector 143 is attached to piping 147 on deck of the buoy 80 by raising said piping and engaging clamps 148.
Fig. 13 shows a top view of the mooring system in the connected state showing four pipes 139, 139\ 140, 140! attached to the mechanical connector 113. The transfer pipes 135,136 are connected to the support structure 102 in articulation joints 133, 134 and can pivot around a substantially longitudinal axis. The pipes 139, 139', 140, 140f are connected to the mechanical connector 113 in articulation joints 141,141', 142,142' and can pivot around a longitudinal, a transverse and a vertical axis. The pipes can move independently of the mooring arms 104, 104',105,105'.
Fig. 14 shows a construction in which the tanker vessel 2 is directly moored to mooring tower 35 carrying regasification plant 13. A similar mooring structure is used as is shown in Fig. 10-13. The vertical arms 104 are now depending directly from the tower 35 in pivot joint 122. The vertical cryogenic duct 135 is connected to a swivel
150, which can rotate around vertical axis 159, the swivel being supported on bearings
151. Also in this embodiment the tanker vessel 2 is offloaded from the bow and is
connected to the tower 35 through horizontal mooring arms 105.
Fig. 15 shows an embodiment wherein the mooring buoy 8 is located at a large distance from a tower 35 such as for instance several hundreds of meters or kilometers,

on which tower 35 the regasification plant 30 is supported. An intermediate LNG duct 152 extends along the seabed towards the regasification plant 13.
In the embodiment shown in Fig. 16, the regasification plant 13 is placed on a SPAR buoy or floating barge at a large distance from the tanker vessel 2. A mid depth LNG duct 150 connect the vessel to the regasification plant 13. Preferably, the middepth cryogenic transfer line 150 is configured in the form as described in European patent application 98201805.3 and 98202824.3, filed in the name of the applicant.





Claims
1. Cryogenic fluid offloading system comprising:
an offshore mooring structure (4, 5, 34, 35, 51, 50, 61, 62, 72, 73, 80),
connected to the seabed,
a connecting member (10, 26, 105, 1051) that is attached to the mooring
structure with a first end (23,115,115') to be displaceable around a vertical
axis (9, 39, 59, 69, 79, 89,99,117,159),
a tanker vessel (2) for loading cryogenic fluid at a first location,
transporting it and offloading the cryogenic fluid at a second location, the
tanker vessel being connected to the mooring structure via the connecting
member,
a first fluid duct (16) connected to the mooring structure, for supplying
fluid away from the mooring structure,
a second fluid duct (14,131, 136, 139,150, 152), connected to the mooring
structure, for transporting fluid coming from the tanker vessel (2), to the
mooring structure,
a processing unit (13) for receiving a cryogenic fluid in liquid phase from
the tanker vessel (2) and for supplying a gaseous phase of the fluid to the
first fluid duct (16), and
fluid supply means (31) for controlling supply of cryogenic fluid from the
tanker vessel (12) to the processing unit (13), characterised in that the connecting member (10, 26, 105, 105') is connected with a second end (22, 113) to the tanker vessel (2), the vertical axis (9, 39, 59, 69, 79, 89, 99, 117, 159) being at least substantially in line with the tanker vessel (2) to allow displacement of the tanker vessel around the vertical axis, control means (30, 36, 37) being provided for opening and closing of the fluid supply means (31) on the basis of a predetermined supply of the gaseous phase through the first fluid duct (16).

2. Cryogenic fluid offloading system according to claim 1, wherein the connecting member comprises an arm (10)3 the arm having a longitudinal section (20) with one end connected to a side of the tanker vessel (2) and extending in the length direction along the vessel towards the mooring structure (4, 5, 34, 35, 51, 50,61, 62, 72, 73, 80), and a transverse section (21) between the longitudinal section (20) and the mooring structure, substantially transverse to the length direction of the vessel.
3 Cryogenic fluid offloading system according to claim 2, wherein the length of the longitudinal section (20) of the arm (10) is at least 1/3, preferably at least 1/2 of the length of the tanker vessel (2).
4. Cryogenic fluid offloading system according claim 2 or 3, the second fluid duct (14) being supported by the arm (10), the arm (10) being attached to the tanker vessel (2) at or near midship of the tanker vessel.
5. Cryogenic fluid offloading system according to claim 2, 3 or 4, the longitudinal section (20) of the arm extending alongside the vessel and being connected to a floating structure (12, 32) moored alongside the tanker vessel.
6. Cryogenic fluid offloading system according to claim 5, wherein the length of the floating structure is not more than 2/3, preferably not more than half of the length of the tanker vessel.

7. Cryogenic fluid offloading system according to claim 5 or 6, wherein the processing unit (13) is placed on theiloating structure (12, 32).
8. Cryogenic fluid offloading system according to any of the preceding claims, the mooring structure comprising a buoy (4, 5, 61, 62, 72? 73), having a first part (5, 61, 73) attached to the sea bed and a second part (4, 62, 72, rotatably connected to the first part around the vertical axis, the second part being attached to the connecting member (10).

. Cryogenic fluid offloading system according to any of the claims 1-6, wherein the processing unit is placed on a floating element (34, 51, 61, 62, 72, 73), the connecting member (10) being with a first end (23) connected to the floating element (34, 51, 61, 62, 72, 73).
LO. Cryogenic fluid offloading system according to claim 9, the mooring structure comprising a tower (35, 50) resting on the seabed (6), the tower being provided with at least one weight (41, 42, 55) suspended from the tower such that it can be deflected away from a vertical equilibrium position, the floating element (34, 51) being connected to the weight (41, 42, 55) via a respective deflection member (44,45, 54).
11. Cryogenic fluid offloading system according to any of claims 1-6, the mooring structure comprising a tower (35) connected to the seabed, the processing unit (13) being placed on the tower, the connecting member (10) being attached to the tower in an articulation joint (91, 92) that can rotate around the vertical axis (99) and pivot around a substantially transverse axis.
12. Cryogenic fluid offloading system according to claim 9, the mooring structure comprising a tower (54) connected to the seabed, a top end of the tower being located below water level, the floating element (51) being attached with at least two cables (54) to the tower, the cables being provided with a restoring weight (55), wherein the floating element has a vertical shaft (52) between an upper and a lower part, a flexible fluid duct (53) extending from the processing unit (13) to the tower (54) via the shaft and being attached to the first fluid duct.
13. Cryogenic fluid offloading system according to claim 9, the floating element
having an inner member (61) that is moored to the sea bed an that supports the
processing unit (13), and an outer member (62) which can rotate around the inner
member, connected to the connecting member (10).

14. Cryogenic fluid offloading system according to claim 9, the floating element having a buoyancy body (72) and a lower connector (73) that is moored to the sea bed (6) and that is rotatably connected to the buoyancy body (72).
15. Cryogenic fluid offloading system according to any of claims 9-14, a flexible fluid duct (53, 66) extending from the floating element from at or near sea level to a predetermined depth below water level.
16. Cryogenic fluid offloading system according to any of the preceding claims, the first fluid duct (14) being attached to the second fluid duct (16) via a first arm

(82) attached to the mooring structure (35) and a second arm (83), substantially vertically supported by the first arm, the connections of the first arm to the mooring structure, of the first arm (82) to the second arm and of the second arm
(83) to the second fluid duct (14), comprising at least she swivels.

17. Cryogenic offloading system according to any of claims 1-6, the mooring structure comprising a tower (35) resting on the seabed (6), the tower being provided with at least one suspension element (104,1041), carrying a substantially horizontal arm (105, 105'), and being connected to a restoring weight (106), the processing unit (13) being placed on the tower (35). '
18. Cryogenic fluid offloading system according to any of the preceding claims, wherein the processing unit (13) comprises no LNG storage tanks that are larger than the volume of the LNG storage tanks of the tanker, preferably larger than 1/2 of the volume and more preferably larger than 1/3 of the volume.
19. Cryogenic offloading system comprising:
an offshore mooring, structure (4, 5, 34, 35, 51, 50, 61, 62, 72, 73, 80), connected to the seabed,
a connecting member (10, 105, 105') that is attached to the mooring structure with a first end (23, 115, 115') to be displaceable around a vertical axis (9, 39, 59, 69, 79, 89, 99, 117,159),

a tanker vessel (2) for loading cryogenic fluid at a first location,
transporting it and offloading the cryogenic fluid at a second location, the
tanker vessel being connected to the mooring structure via the connecting
member,
a first fluid duct (16) connected to the mooring structure, for supplying
fluid away from the mooring structure,
a second fluid duct (14,131, 136,139,150,152), connected to the mooring
structure, for transporting fluid coming from the tanker vessel (2), to the
mooring structure,
a processing unit (13) for receiving a cryogenic fluid in liquid phase from
the tanker vessel (2) and for supplying a gaseous phase of the fluid to the
first fluid duct (16), and
fluid supply means (31) for controlling supply of cryogenic fluid from the
tanker vessel (12) to the processing unit (13), characterised in that the processing unit (13) is spaced at a distance of at least several tens of meters preferably several hundreds of meters, more preferably several kilometers from the mooring structure, the mooring structure being connected via an LNG duct (150,152) to the processing unit.
10. Cryogenic offloading system according to claim 19, the processing unit being placed on a tower (35) or a buoy (151).

21. A cryogenic fluid offloading system substantially as herein described with reference to the accompanying drawings.


Documents:

1279-chenp-2004-abstract.pdf

1279-chenp-2004-claims duplicate.pdf

1279-chenp-2004-claims original.pdf

1279-chenp-2004-correspondnece-others.pdf

1279-chenp-2004-correspondnece-po.pdf

1279-chenp-2004-description(complete) duplicate.pdf

1279-chenp-2004-description(complete) original.pdf

1279-chenp-2004-drawings.pdf

1279-chenp-2004-form 1.pdf

1279-chenp-2004-form 19.pdf

1279-chenp-2004-form 26.pdf

1279-chenp-2004-form 3.pdf

1279-chenp-2004-form 5.pdf

1279-chenp-2004-pct.pdf


Patent Number 205703
Indian Patent Application Number 1279/CHENP/2004
PG Journal Number 26/2007
Publication Date 29-Jun-2007
Grant Date 09-Apr-2007
Date of Filing 10-Jun-2004
Name of Patentee M/S. SINGLE BUOY MOORINGS INC
Applicant Address 5, route de Fribourg, CH-1723 Marly
Inventors:
# Inventor's Name Inventor's Address
1 WILLE, Hein 9, rue Monte St. Michel, F-06360 Eze
2 POLDERVAART, Leendert 2, Impasse du Castelleretto, MC-98000 Monaco
3 QUEAU, Jean, Pierre
PCT International Classification Number B63B 27/24
PCT International Application Number PCT/EP2002/014285
PCT International Filing date 2002-12-12
PCT Conventions:
# PCT Application Number Date of Convention Priority Country
1 01204865.8 2001-12-12 EUROPEAN UNION